- 10 min
- to set up
- 9
- working sheets
- 7
- messages to edit
- 35
- launch checks
What you downloaded
One ZIP: monsikit-client-delivery-kit-v1.1.3.zip. Unzip it anywhere.
Two workbooks
Blank, and a worked example.
Scripts and brief
Two .docx files you edit.
Quick-start PDF
Three pages.
Notion folder
CSV and Markdown to import.
The folder also holds README.txt, LICENSE.txt and CHANGELOG.md. See the full file list.
Ten-minute setup
- Open
Client-Delivery-Kit_Worked-Example.xlsx. Click through the sheets. Cream cells with a solid border are Input. Grey cells with a dashed border are Calculated. - Open the blank workbook. Save a copy for your first project.
- On 3 Quote, set your rate, your cost per hour, and your own contingency and revision numbers. They are yours, not advice.
- Open
Client-Message-Scripts.docx. Edit the wording once so it sounds like you. - Keep the blank workbook untouched as your master.
The workflow
Find your stage. Open the sheet. Send the message.
| Stage | Sheet | Message | Done when |
|---|---|---|---|
| Lead arrives | 1 Inquiry | None | You know whether to quote |
| Quote | 3 Quote | None | Fee agreed |
| Kickoff | 2 Brief, 6 Assets | Onboarding | One approver agreed |
| Collecting content | 6 Assets | Missing assets | Needed items received |
| Build and review | 5 Revisions, 7 Status | Feedback, Approval | Final approval recorded |
| Extra request | 4 Scope changes | Scope change | Request decided |
| Before launch | 8 Launch QA | None | No failing checks |
| Delivery | 9 Handoff | Handoff | Client holds their access |
| After launch | 7 Status | Aftercare | Check-in done |
The quote formulas
Each formula on 3 Quote sits beside its result in the sheet. Enter percentages as percentages: 10% is stored as 0.10. Blank, text and negative inputs count as 0.
| Result | Calculation |
|---|---|
| Base task hours | Sum of task hours above 0 |
| Contingency hours | Base hours x contingency % |
| Revision hours | Whole rounds x hours per round |
| Total hours | Base + contingency + revision hours |
| Labour fee | Total hours x hourly rate |
| Direct costs billed | Direct costs above 0, x (1 + markup %) |
| Discount | (Labour fee + direct costs billed) x discount %, capped at 100% |
| Project fee | Subtotal minus discount, rounded to 2 decimals |
| Your cost | Total hours x your cost per hour, plus direct costs at cost |
| Profit and margin | Fee minus your cost. Margin is profit divided by fee, or 0 if the fee is 0 |
| Effective hourly rate | (Fee minus direct costs at cost) divided by total hours, or 0 if no hours |
| Check | Add task hours, Below your cost, Thin margin, or Margin OK |
Worked example: 41 task hours, plus 4.1 contingency, plus 4 revision hours is 49.1 hours. At a 65.00 rate that is 3,191.50. Direct costs of 79.00 with 10% markup add 86.90. The project fee is 3,278.40. At 35.00 cost per hour, profit is 1,480.90. Margin is 45.2%.
You can try these numbers in the free calculator.
Reset and duplicate
Copy the blank workbook for each project. To reuse a filled copy, select each cream range and press Delete. Never delete grey cells. Never delete the 3 Quote sheet, because other sheets read from it. If a formula breaks, copy that cell from the blank workbook.
Access and passwords
Never ask a client for a password. Never store one in the workbook. Ask them to invite you from inside the account, with the lowest role that does the job. The handoff sheet ends with removing your access. Background: the onboarding checklist guide.
Notion
There is no Notion template link in this release. The notion/databases folder holds CSV files. The notion/pages folder holds Markdown.
In Notion, open a page and choose Import, then CSV or Text and Markdown. Columns usually import as text. Change stage and status columns to Select, and date columns to Date. Menu names in Notion may differ. Full steps are in notion/IMPORT-TO-NOTION.md.
If something looks wrong
- A cell shows #VALUE! or #NAME? A formula was overwritten, or the app lacks a function. Copy the cell from the blank workbook.
- Dropdowns are missing in Google Sheets. Add them again: Data, Data validation, list of items.
- Dates show as numbers. Format the column as Date.
- Overdue counts look off. Update the As of date on the Status sheet.
Still stuck? Use the support form.