A client onboarding checklist for a web designer is a short list to confirm before design starts. Confirm who approves, what is in and out of scope, what the client must send and when, how you will talk, how many revision rounds are included, and how you get access without passwords. Do it in week one. Put it in writing.
What should the checklist include?
Eight things cover most projects. Each one is here because skipping it often slows a project down.
| Confirm | Write down | Without it |
|---|---|---|
| One approver | Who gives final sign-off. | Three people send feedback that clashes. |
| Deliverables | Each page or file, with a check you can test. | "Finished" means two different things. |
| Exclusions | What is not included: copywriting, photos, a shop. | "I assumed you would" appears halfway through. |
| Assets and dates | Each item you need, with a due date. | You wait, the launch slips, and it becomes your delay. |
| Revision rounds | How many rounds are included, and what counts as one. | Endless small tweaks you cannot price. |
| Communication | Where you talk and how fast you reply. | Urgent notes land in the wrong place. |
| Access method | How you get invited, and with which role. | Passwords end up in email. |
| Key dates | Kickoff, first review, approval, launch. | Nobody can tell if the project is late. |
When should onboarding happen?
Right after the client accepts the quote, and before you open a design tool. The client is most engaged then. Every answer you collect now is one you will not chase later.
One message and a one-page brief usually do the job. A call is optional. If you have one, write down what was decided afterwards.
How do you collect client assets without chasing?
Give every item a name, an owner and a date. Say in advance what happens if it is late. Chasing feels awkward because nobody agreed on the consequence.
List it
Put every item in one place: logo, colours, copy, photos, domain details.
Mark blockers
Show which items hold up which milestone.
Date it
One date per item. Not "as soon as you can".
Agree a fallback
Use placeholders for now, or move the milestone.
Remind once
Name the item and offer the two options.
Letting the client choose between placeholders and a later date keeps the decision with them.
How should you get access to a client's accounts?
Do not ask for passwords. Ask the client to invite you from inside their own account. That covers the domain, hosting, analytics and social profiles. Ask for the lowest role that lets you do the job.
An invite can be traced and removed. A password sitting in an inbox cannot. Write the removal date into the plan on day one. At handoff, remove your own access so the client holds their accounts.
Who approves the work?
Name one approver. If the client has a partner, a board or a marketing lead, they can collect everyone's views first. Then they send you one reply.
Say it plainly: "I will treat [name] as the person who gives final sign-off. If that changes, tell me." Without this, the last email wins. The last email is often the loudest, not the most senior.
What should you tell the client about revisions?
Say how many review rounds the price includes. Say what a round is: one set of feedback on one version, sent in one go.
Also say how you will treat a request outside the brief. If it adds a page, a feature or a new tool, it is a scope change. You price it before you start. The scope change log guide shows how to record that without it feeling like blame.
What does a good onboarding message look like?
This is adapted from the Onboarding script in the kit. Replace everything in square brackets.
Subject: Getting started: [Project name]
Hi [Client first name],
Thanks for confirming [Project name]. Here is how the next few weeks will work.
- What I need from you: the items on the attached checklist. The most important are [item 1] and [item 2], needed by [date].
- Who approves: I will treat [Approver name] as the person who gives final sign-off. If that changes, tell me.
- Where we talk: I reply to emails within [number] working days. For anything urgent, use [channel].
- Feedback rounds: the plan includes [number] rounds of changes on each deliverable. I will price anything beyond that, or outside the agreed list, before I start it.
- Access: please do not send me passwords. Invite me from inside the account with the lowest role that works.
First milestone: [milestone] on [date].
Thanks, [Your name]
What are the most common onboarding mistakes?
Avoid
- Treating the quote as the brief.
- Agreeing things on a call and never writing them down.
- Asking for assets "when you have them".
- Counting "looks good" in chat as sign-off.
- Collecting passwords.
Do instead
- List deliverables and exclusions apart from the price.
- Send three lines after each call to confirm.
- Give each asset a date.
- Ask for approval of a named deliverable.
- Ask for an invite with the lowest role.
A checklist cannot make a client reply fast. It makes gaps visible while they are cheap to fix. It is also not a contract. Have your own adviser review any terms.
How does the Client Delivery Kit cover onboarding?
I built the kit so these points live in files you reuse. The Client Delivery Kit has:
- an Inquiry sheet with six fit questions,
- a Brief sheet with checks and exclusions,
- an Assets checklist with 15 items and dates,
- the Onboarding and Missing assets scripts.
You can try the quote part free with the free sample. The documentation shows the setup. I recalculated the workbook in LibreOffice and checked it against a separate calculation.